top of page

Condo Renovation

Condo Gut and Renovate

This two story condo was renovated due to a water heater leak in the attic. The project consisted of the complete gutting of the kitchen, first, and second baths. New flooring and drywall were also installed on both levels.


The kitchen ceiling was raised and the plumbing and electrical were hidden in the soffit above the cabinets. Custom crown molding was installed from the top of the cabinet to the ceiling to hide it all and beautify the space.


Both the first floor and second floor bathrooms were renovated, one with a walk in shower and the other with a tub. The same materials were used in both spaces to keep consistency.


Other areas of renovation included flooring, closet doors in both bedrooms, the loft space, and the laundry.

Project Gallery

bottom of page